Gillingham Drylining FAQ
What are the building regulations for dry lining in Gillingham?
Building Regulations approval in Gillingham is handled by Gillingham City Council Building Control. The four parts of the Building Regulations that most often apply to drylining work are:
- Part A (Structure) — if you are removing or modifying load-bearing walls - Part B (Fire Safety) — fire-rated plasterboard on escape routes, garage ceilings, between garage and living space, in HMOs and flats - Part E (Resistance to Sound) — acoustic separating walls in flats, conversions, and HMOs (40-45 dB Rw) - Part L (Thermal) — insulated plasterboard achieving target U-values on external walls (currently 0.30 W/m²K or better for solid wall retrofits) - Part C (Damp) — moisture-resistant plasterboard in wet areas, vapour-control layers on the warm side of insulation - Part F (Ventilation) — adequate extract in kitchens and bathrooms
Notification fees (2026): domestic alterations ~£180-£450, full plans domestic ~£350-£600, commercial project-specific. Inspection stages: pre-plasterboard and completion. Gillingham Building Control is reasonably responsive — typical 5-7 working day inspection booking.
We handle the Building Control notification on every Gillingham job that requires it. For work that doesn't require notification (e.g. like-for-like replacement plasterboard in a domestic room), we still work to BS 8212 best practice but no formal sign-off is needed.